top of page

Hilton Elementary Key Projects

Hilton Drone2_edited.jpg

Security Lockout System

The-Smart-Boot-System-856x1024.png

A secure lockout system further enhances safety by providing schools with a fast, coordinated response during emergencies.  With a push of a button, staff can instantly activate a building- wide lockout, automatically notifying law enforcement, first responders, and key personnel while delivering clear instructions throughout the school.  By reducing response time and eliminating communication delays, the system enhances student and staff safety, supports consistent emergency procedures, and helps ensure every second counts when it matters most.

New Gymnasium

Hilton Gym 2.jpg

Hilton's shared cafeteria and gym create ongoing challenges for students and staff. The combined space limits the effectiveness of physical education. Building a dedicated gymnasium would provide students with a safe, reliable space for physical activity while allowing the existing gym to be converted into much-needed classroom space. Because gymnasium construction is significantly less expensive than building new classroom space, this approach addresses two facility needs in a more cost-effective way.

​

Additional Classroom Space

hilton classroom.jpg

Today's students have a wide range of learning needs, and our schools need spaces that support their academic success. By remodeling existing areas and making the most of the space we have, we can expand classroom space and dedicated areas for small-group instruction, individualized academic support, and enrichment.  These improvements will help reduce class sizes and give support staff appropriate spaces to work with students.  Sensory rooms will also help students regulate emotions and refocus so the can return to learning.  Together, these changes will better use our school buildings to give every student the space and support they need to succeed.

Drive Loop and Parking Lot Renovations

Expanding the parking area and bus drive loop will improve traffic flow and reduce congestion during student arrival and dismissal. Separating bus and passenger vehicle traffic minimizes potential conflicts, enhances pedestrian safety, and provides safer, more efficient access for students, staff, and visitors while improving emergency vehicle access when needed.

Mechanical/ Electrical/ Plumbing

mep.jpeg

Many of the school's mechanical, electrical, and plumbing systems—including boilers, chillers, and other critical equipment—are aging and nearing the end of their useful life. Replacing these essential systems will improve reliability, increase energy efficiency, reduce costly emergency repairs, and help ensure students and staff have a safe, comfortable, and well-functioning learning environment for years to come.

bottom of page